A 19,000 sq. ft. building designed to replace the existing facility, and to house the design and manufacturing operations of forest fire fighting vehicular equipment. The project is under construction and to be completed in the summer of 2014.
A 19,000 sq. ft. building designed to replace the existing facility, and to house the design and manufacturing operations of forest fire fighting vehicular equipment. The project is under construction and to be completed in the summer of 2014.